Request #17-71
  Open
1. Information and documents regarding the renewal or nonrenewal of APM Terminals Tacoma, LLC's lease with the Port of Tacoma for the years 2017 and 2018.

2. Information and documents regarding any contract or lease agreement between the Port of Tacoma and SSA Marine to occupy the space currently occupied by APM Terminals Tacoma, LLC.

Received

July 6, 2017 via web


Departments

None Assigned


Requester

Alyssa Englebrecht

Documents

Public

(loading...)

Staff

Point of Contact

Diane Jordan

Document(s) Released to Requester   Details Public
1. West Sitcum Basin C - Notice to Proceed (1).pdf
2. West Sitcum Basin B - Notice to Proceed (1).pdf
3. West Sitcum Basin A - Notice to Proceed (1).pdf
4. West Sitcum paving_reefer area_10.18.17 (1).pdf
5. West Sitcum Reefer Rows Paving Repairs 201035.01 $175K (1).pdf
6. Sales Order Acknowledgement.pdf
7. 070444 American Construction Bid Question (1).pdf
8. 2017 APMT Fender Repair - Bid doc questions.pdf
9. Bid Docs_1 of 2_POT APMT Fender Repair.pdf
10. RE_ APMT questions.pdf
11. APMT questions.pdf
12. APMT Fender Repair_ Project Example Sheets.pdf
13. Question - APMT Fender Repair.pdf
14. Port of Tacoma APMT Fender Repair (Con #07444) ....pdf
15. 070444 Hamilton Contruction Bid Questions 06-13-17 (1).pdf
16. 070444 Q&A 01 (1).pdf
17. 070444 Q&A 01 (1).pdf
18. 070444 Q&A 02 (1).pdf
19. Manson - Insurance - APMT questions (1).pdf
20. Manson - Project Example Sheets (1).pdf
21. 2017-08-25 Pile Driving Logs.pdf
22. SWPPP.pdf
23. request.pdf
24. request.pdf
25. request.pdf
26. request.pdf
27. request.pdf
28. request.pdf
29. O&M - APM Terminals Crane Power Feed.pdf
30. transmittal to APMTCargotec 07202012 (1).pdf
31. As-Built - APM Terminals Crane Power Feed.pdf
March 27, 2020, 7:27am
Document(s) Released to Requester   Details Public
1. Phase 1 WQ Monitoring Summary Report - WE 02.07.16 (2).pdf
2. Phase 1 WQ Monitoring Summary Report - WE 02.14.16 (1).pdf
3. February 2016 Pier 4 EPA Progress Report_2016-0224 (1).pdf
4. March 2016 Pier 4 EPA Progress Report_2016-0323 (1).pdf
5. May 2016 Pier 4 EPA Progress Report_2016-0526 (1).pdf
6. Exhibit C Draft Tacoma Checklist and Port Items (3).pdf
7. RFP 16 Work Orders.pdf
8. RFP 15 Work Orders.pdf
March 10, 2020, 4:49pm
Document(s) Released to Requester   Details Public
1. Exhibit C Draft Tacoma Checklist and Port Items (1).pdf
1.a.Exhibit C Draft Tacoma Checklist and Port Items (2).pdf
2. 00 52 00-AGREEMENT FORM EMERGENCY.pdf
3. request.pdf
4. Performance bond.pdf
5. 00 73 46 Prevailing Wage.pdf
6. 00 73 63-SECURITY REQUIREMENTS (1).pdf
7. 00 72 00-GENERAL CONDITIONS (1).pdf
8. 070772 Executed Agreement (1).pdf
9. 070772 Insurance Certificate (1).pdf
10. 00 73 16 Insurance.pdf
11. 070772 Notice of Award - Notice to Proceed (1).pdf
12. 070772 Noticeof Award.pdf
13. 070772 Project Manual (1).pdf
14. Reference 1. NWS-2018-368-WRD; Outfall Tide Gate Removal (1).pdf
15. Reference. 2. NWS-2018-368 Drawings (1).pdf
16. Reference. 2013-04-25 JStebbing and Valve (1).pdf
17. Reference. 3. CWA & RHA Extracts and Definitions (1-22-09) (1).pdf
18. reference. 3880-0C303 (1).pdf
19. 3880-0C319 (1).pdf
20. Reference. 3880-0G001.pdf
21. 4917-000C1 (002) (2).pdf
22. 5298-00C11 (1).pdf
23. Reference. Outfall (1).pdf
24. 070466 TO 08.pdf
24. Task Order. American Const Estimate.pdf
25. Task Order. Install Duckbill Check Valve, 3-15-18.pdf
26. Task Order. Install In-Line Check Valve, 5-11-18.pdf
27. Remove Duckbill Check Valve, 3-6-18.pdf
28. Task Order. Remove Flap Gate Valve, 5-11-18.pdf
February 6, 2020, 12:01pm
Document(s) Released to Requester   Details Public
1. 3380-0C401_Sanitary and Water_1984.pdf
2. Phase 1 WQ Monitoring Summary Report - WE 11.01.15.pdf
3. Phase 1 WQ Monitoring Summary Report - WE 11.15.15 (1).pdf
4. Phase 1 WQ Monitoring Summary Report - WE 11.08.15.pdf
5. Phase 1 WQ Monitoring Summary Report - WE 11.22.15.pdf
6. October 2015 Pier 4 EPA Progress Report_2015-1023.pdf
7. Phase 1 WQ Monitoring Summary Report - WE 12.06.15.pdf
8. Phase 1 WQ Monitoring Summary Report - WE 12.13.15 (1).pdf
9. Phase 1 WQ Monitoring Summary Report - WE 12.20.15.pdf
10. Phase 1 WQ Monitoring Summary Report - WE 12.27.15.pdf
11. December 2015 Pier 4 EPA Progress Report_2015-1223 (1).pdf
12. Phase 1 WQ Monitoring Summary Report - WE 01.03.16.pdf
13. December 2016 Pier 4 EPA Progress Report_2016-0126 (1).pdf
14. Phase 1 WQ Monitoring Summary Report - WE 01.24.16.pdf
15. Phase 1 WQ Monitoring Summary Report - WE 01.31.16.pdf
16. Phase 1 WQ Monitoring Summary Report - WE 02.07.16.pdf
17. Phase 1 WQ Monitoring Summary Report - WE 02.14.16.pdf
18. February 2016 Pier 4 EPA Progress Report_2016-0224.pdf
19. 1 March 2016 Pier 4 EPA Progress Report_2016-0323.pdf
19. March 2016 Pier 4 EPA Progress Report_2016-0323.pdf
20. May 2016 Pier 4 EPA Progress Report_2016-0526.pdf
January 24, 2020, 12:05pm
Document(s) Released to Requester   Details Public
1. 14 September 2016 Final EPA Notice of Completion (1).pdf
2. 2016 Feb 18 EPA Removal Action Completion Letter.pdf
3. Action Memo Figures.pdf
4. Blair Waterday TBT Action Memo final signed 01 27 15.pdf
5. Blair Waterway TBT Action Memo Figures.pdf
6. BlairWaterwayNoticeLetter.5.21.14.pdf
7. BlairWaterwayTBT.AOC2.Final.pdf
8. Collaborative EPA Time-Critical Sediment Removal Action.pdf
9. Corps Sec 404 & 10, Expires 03-17-2019 (NWS-2014-0456-WRD)_Pier 4 Phase 2 Reconfiguration.pdf
10. December 2015 Pier 4 EPA Progress Report_2015-1223.pdf
11. December 2016 Pier 4 EPA Progress Report_2016-0126.pdf
12. Dredge Return Water Treatment Performance Requirements_Compliance 9_9_14.pdf
13. Dredging and Disposal Work Plan Rev 3 Submittal (4th Edition).pdf
December 29, 2019, 1:44pm
Document(s) Released to Requester Public
1. 0377.pdf
2. APMT FCA Final Report 2012-12-04.pdf
3. APMT FCA Report External 01032013.pdf
December 17, 2019, 9:47am
Document(s) Released to Requester Public
1. 091407_070107 Shoreline Stabilization Project Drawings For Bidding.pdf
2. 091407_070107 Shoreline Stabilization Project Manual For Bidding.pdf
3. 0277.pdf
4. 0330.pdf
December 5, 2019, 5:37pm
Document(s) Released to Requester   Details Public
1. 1982_Drainage Plans for Wast Milwaukee Waterway_5283-20.pdf
2. 3545-23_Site Grading Storm Sewer_1978_1.pdf
3. 3545-23_Site Grading Storm Sewer_1978_2.pdf
4. 3880-23_0C308 (Sheet 28)_1984_highlighted.pdf
5. 3880-23_0C318 (Sheet 33)_Trench Drain Details_1984.pdf
6. 3880-23-0C202 (sheet 17) existing site and demo plan_1984.pdf
7. 3880-23-0C203 (sheet 18) existing site and demo plan_1984.pdf
8. 3880-23-0C204 (sheet 19) existing site and demo plan_1984.pdf
9. 3880-23-0C319 (sheet 34) OWS and Outfall Details.pdf
10. 3880-23-0M201_Fueling Facility_1984.pdf
11. 5283-20_Storm_1999.pdf
12. Horizon Terminal Drainage Plan_Potential Trtmt Locations_2011.pdf
13. Horizon Terminal Drainage Plan_Sampling Results Feb.2011.pdf
14. Sealand_4189-23_C3_1987.pdf
15. Sealand_4189-23_Sheets1-11_1987.pdf
16. Sealand_4398-20_1984.pdf
17. Sealand_5283-20_1999.pdf
18. South Outfall_Check Valve_2017.pdf
19. Tacoma Terminals Inc_3565-23_1983.pdf
20. 3380-0C401_Sanitary and Water_1984.pdf
21. 3880-23_0C403 (Sheet 238) Sewer and Water_1984.pdf
22. Sanitary_Sewer_Details_3880-23-0C416 OWS_1984.pdf
23. WST Reefer Wash Facility Details 1984.pdf
24. 3880-23_0C301 (Sheet 21)_Paving and Drainage_1984.pdf
25. 3880-23_0C302 (Sheet 22)_Paving and Drainage_1984.pdf
26. 3880-23_0C303 (Sheet 23)_Paving and Drainage_1984.pdf
27. 3880-23_0C305 (Sheet 25)_Paving and Drainage_1984.pdf
28. 3880-23_0C306 (Sheet 26)_Paving and Drainage_1984.pdf
29. 3880-23_0C307 (Sheet 27)_Paving and Drainage_1984.pdf
30. 3880-23_0C308 (Sheet 28)_Paving and Drainage_1984.pdf
31. Drainage Sheet for Milwaukee Fill AS-BUILT 1 G-1 to E-1.pdf
32. Sealand As-Builts_4917-23_Cover_1997.pdf
33. Sealand_As-Builts_4917-23_1997.pdf
34. Tacoma_Terminals_Inc_3977-000C4 Dwgs_1985.pdf
35. West_Sitcum_Terminal_3545-00019 Dwgs_1978.pdf
36. WST_3545-25_Sheet4_1978.pdf
37. WST_3545-25_Sheet5_1978.pdf
November 12, 2019, 11:54am
Document(s) Released to Requester Public
1 091407_070107 Shoreline Stabilization Project Drawings For Bidding (1).pdf
2. 091407_070107 Shoreline Stabilization Project Manual For Bidding (4).pdf
October 29, 2019, 2:31pm
Document(s) Released to Requester   Details Public
1. NWS-2018-368-WRD; Outfall Tide Gate Removal.pdf
2. NWS-2018-368 Drawings.pdf
3. 2013-04-25 JStebbing and Valve.pdf
4. CWA & RHA Extracts and Definitions (1-22-09).pdf
5. 3880-0C303.pdf
7. 4917-000C1 (002).pdf
8. 3880-0C319.pdf
9. 5298-00C11.pdf
10. Outfall.pdf
11. 14 September 2016 Final EPA Notice of Completion.pdf
11. 3880-23_0C301 (Sheet 21)_Paving and Drainage_1984.pdf
12. 3880-23_0C302 (Sheet 22)_Paving and Drainage_1984.pdf
13. 3880-23_0C303 (Sheet 23)_Paving and Drainage_1984.pdf
14. 3880-23_0C304 (Sheet 24)_Paving and Drainage_1984.pdf
15. 3880-23_0C305 (Sheet 25)_Paving and Drainage_1984.pdf
16. 3880-23_0C306 (Sheet 26)_Paving and Drainage_1984.pdf
17. 3880-23_0C307 (Sheet 27)_Paving and Drainage_1984.pdf
18. 3880-23_0C308 (Sheet 28)_Paving and Drainage_1984.pdf
19. Drainage Sheet for Milwaukee Fill AS-BUILT 1 G-1 to E-1.pdf
20. Sealand As-Builts_4917-23_Cover_1997.pdf
21. Sealand_As-Builts_4917-23_1997.pdf
22. Tacoma_Terminals_Inc_3977-000C4 Dwgs_1985.pdf
23. WST_3545-25_Sheet5_1978.pdf
24. WST_3545-25_Sheet4_1978.pdf
25. West_Sitcum_Terminal_3545-00019 Dwgs_1978.pdf
October 9, 2019, 5:14pm
Document(s) Released to Requester Public
3. W Sitcum (March 2018)_Part3.pdf
September 19, 2019, 8:27pm
Document(s) Released to Requester Public
3. W Sitcum (March 2018)_Part2.pdf
September 9, 2019, 1:43pm
Document(s) Released to Requester Public
3. W Sitcum (March 2018)_Part1. updated.pdf
August 29, 2019, 10:45pm
Document(s) Released to Requester Public
2. W Sitcum (February 2018).pdf
August 16, 2019, 2:41pm
Document(s) Released to Requester Public
1. W Sitcum (January 2018) (2).pdf
August 7, 2019, 7:00pm
Document(s) Released to Requester Public
1. W Sitcum (January 2018)1 to 125_Part4.pdf
July 25, 2019, 11:37am
Document(s) Released to Requester Public
1. W Sitcum (January 2018)1 to 125_Part3.pdf
July 8, 2019, 3:04pm
Document(s) Released to Requester Public
1. W Sitcum (January 2018)1 to 125_Part2.pdf
June 21, 2019, 2:47pm
Document(s) Released to Requester Public
40th 190611. 1. W Sitcum.pdf
June 11, 2019, 10:36pm
Document(s) Released to Requester   Details Public
1. West Sitcum Stormwater_!Port of Tacoma.Genl Peninsula.PrelimEvalRpt.pdf
2. West Sitcum Stormwater_Additional plan sets_Utilities Maps.pdf
3. Pier Extension.pdf
4. NWSA-20170420.01 APMT Stormwater Treatment Project 20-6005-00-1116-01 Rhodes 1.5K.pdf
5. NWSA-20170522.01 West Sitcum Terminal (APMT) Stormwater Treatment 201024.01 Rhodes 300K.pdf
6. Int_RFP_16_Scanned Work Orders.pdf
7. PSAcatch basins.pdf
8. 100277 -- Check # 210286 INTERSTATE PRODUCTS Vendor # 111665_C8593368 (1).pdf
9..pdf
10. 102211 -- Check # 211457 SHOPE CONCRETE PRODUCTS Vendor # 000619_C8594424 (1).pdf
11. 105503 -- Check # 212875 INTERSTATE PRODUCTS Vendor # 111665_C7331510 (1).pdf
12. 105503 -- Check # 212875 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7331510 (2).pdf
13. 107319 -- Check # 213780 INTERSTATE PRODUCTS Vendor # 111665_C7332273 (1).pdf
14. 107319 -- Check # 213780 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7332273 (1).pdf
15. 109317 -- Check # 215391 INTERSTATE PRODUCTS Vendor # 111665_C7333172 (1).pdf
16. 109317 -- Check # 215391 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7333172 (1).pdf
17. 67132 -- Check # 191086 NRC ENV SERVICES Vendor # 010789_C743840 (1).pdf
18. 70315 -- Check # 192772 INTERSTATE PROD Vendor # 111665_C7432616 (1).pdf
19. 70315 -- Check # 192772 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7432616 (1).pdf
20. 72485 -- Check # 193991 INTERSTATE PROD Vendor # 111665_C7433952 (1).pdf
21. 72485 -- Check # 193991 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7433952 (1).pdf
22. 73073 -- Check # 194324 INTERSTATE PROD Vendor # 111665_C7434185 (1).pdf
23. 73073 -- Check # 194324 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7434185 (1).pdf
24. 73264 -- Check # 194456 INERSTATE PROD Vendor # 111665_C7434324 (1).pdf
25.73264 -- Check # 194456 Vendor Name_ INERSTATE PRODUCTS Vendor # 111665_C7434324 (1).pdf
26. 73577 -- Check # 194643 INTERSTATE PROD Vendor # 194643_C7434518 (1).pdf
26. 73577 -- Check # 194643 Vendor Name_ INTERSTATE PRODUCTS Vendor # 194643_C7434518 (1).pdf
27. 78806 -- Check # 197270 INTERSTATE PROD Vendor # 111665_C7661610 (1).pdf
28. 80262 -- Check # 198143 INTERSTATE PROD Vendor # 111665_C7662513 (1).pdf
29. 80262 -- Check # 198143 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7662513 (1).pdf
30. 82817 -- Check # 199809 INTERSTATE PROD Vendor # 111665_C7664050 (1).pdf
31. 87147 -- Check # 203147 SHOPE CONCRETE PROD Vendor # 000619_C8351618 (1).pdf
32. 87185 -- Check # 203115 INTERSTATE PROD Vendor # 111665_C8351586 (1).pdf
33. 87185 -- Check # 203115 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C8351586 (1).pdf
34. 87714 -- Check # 203401 INTERSTATE PROD Vendor # 111665_C8351878 (1).pdf
35. 93467 -- Check # 206734 SHOPE CONCRETE PROD Vendor # 000619_C85969 (1).pdf
36. 93608 -- Check # 206908 EVERSON'S ECON-VAC Vendor # 007188_C859125 (1).pdf
37. 95370 -- Check # 208026 INTERSTATE PRODUCTS Vendor # 111665_C859937 (1).pdf
38. 96466 -- Check # 208604 INTERSTATE PRODUCTS Vendor # 111665_C8591449 (2).pdf
39. 98870 -- Check # 209709 SHOPE CONCRETE PRODUCTS Vendor # 000619_C8592603 (2).pdf
40. PSA-Interrogatories (1).pdf
May 28, 2019, 9:41am
Document(s) Released to Requester Public
1. Scanned Work Orders.pdf
2. _Scanned Work Orders.pdf
May 15, 2019, 6:18pm
Document(s) Released to Requester   Details Public
1. 091433 APMT Route (1).pdf
2..pdf
3. 2014-01-09 Rubstrip Sketch (2).pdf
4. 2014-01-22 Pile Delivery (1).pdf
5. 2014-02-04 Voorhees Invoice (1).pdf
6. 2014-02-07 GeoEngineers Invoice (1).pdf
7. pdf.pdf
8. 20140303.01 APMT Fender Repairs (3).pdf
9. 2014-04-25 Project Detail (1).pdf
10. 2014-05-05 Project Detail (1).pdf
11. 2014-06-05 Project Detail.pdf
12. Marine Mammal Monitoring (1).pdf
13. Norpac Enterprises (1).pdf
14. NWS14. A-20170306.01 APMT Bull Rail Power Study with Recom 20-6005-00-1116-01 Shawyer 7.5K (1).pdf
15. PO 61987 Voohees (1).pdf
16. PO 62463 Norpac (1).pdf
17. pdf.pdf
18. pdf.pdf
April 30, 2019, 9:12pm
Document(s) Released to Requester   Details Public
1. 2017-09-07 WAR305772 Facility Map.pdf
1`6. Exhibit A Draft.pdf
2. 2017-09-07 WAR305772 PermitModApWS.pdf
3. 170912. WSAOFinal Draft.pdf
4. 2017-09 Modification of Permit Coverage WAR305772.pdf
5. Request for Mod Permit Coverage Tech BasisDS28Aug AF.pdf
6. tnt.pdf
7. OrderConf01.pdf
8. RE_ LEGAL # 3271808.pdf
8.1 OrderConf.pdf
9. 2017-10-16 ESAF Signed (1).pdf
10. Annual Fee Form.pdf
11. PARIS Screenshot 10-2-17.pdf
12. WAR305772 WQFee Form.pdf
13. Annual Fee Form (1).pdf
14. PARIS Screenshot 10-2-17 (1).pdf
15. 1-9-18 Photos.pdf
16. 2017 Figure 2_REV2.pdf
17. 2017 SWPPP Certification (1).pdf
18. 2017_SWPPP_Final_West Sitcum Terminal.pdf
19. 2017Oct.SWPPP.Draft.PoT-West_Sitcum_Terminal.pdf
20. 2017Oct.SWPPP.Port of Tacoma-West Sitcum Terminal (1).pdf
21. 2018_SWPPP_Draft_West Sitcum Terminal.pdf
22. 2018_SWPPP_Draft_West Sitcum Terminal.pdf
23. 2018_SWPPP_Draft_West Sitcum Terminal.pdf
24. 2018_SWPPP_Final_West Sitcum Terminal.pdf
25. 2018_SWPPP_Mark-up_West Sitcum Terminal AF notes.pdf
March 27, 2019, 10:57pm
Document(s) Released to Requester   Details Public
1. Copy of Record PortofTacoma Thursday August 24 2017.pdf
2. DOE submision cover letter.pdf
3. Public Notice.pdf
4. TNT Confirmation.pdf
5. PARIS snapshot.pdf
6. PORT OF TACOMA 3251594.pdf
7. RE_ Industrial Stormwater General Permit - West Sitcum Terminal - A.pdf
8. WAR305772 Permit Cover Letter.pdf
9. 2017-10-24 Cover Certified.pdf
10. AgreedOrder15434signed (1).pdf
11. AgreedOrderSignaturePage.pdf
12. AgreedOrder15434signed.pdf
13. AgreedOrderWSitcum (1).pdf
14. Compliance Order Draft.pdf
15. Draft AO Requirements3Dseamanedits.pdf
16. Draft AO.pdf
17. West Sitcum Proposed Draft Order.pdf
18. WSAOFinal.pdf
19. 2018_01_12 WAR305772 Engineering_Report_Cover Letter.pdf
19. WSAOVersion3.pdf
20. 2018_02_06 west sitcum ER DOE approved.pdf
21. 2018-01-12 ER Cover Letter Signed.pdf
22. Copy of Record PortofTacoma Friday January 12 2018.pdf
23. Cover Letter PortofTacoma Friday January 12 2018.pdf
24. Schedule - West Sitcum Stormwater Treatment Project.pdf
25. SWEngRpt_WestSitcum_2018011_Print.pdf
26. SWEngRpt_WestSitcumFinal_2018012_Print.pdf
March 12, 2019, 7:22pm
Document(s) Released to Requester   Details Public
1.. Declaration of Emergency Affidavit of Publication.pdf
2. Declaration of Emergency West Sitcum Sub 1 SH Electrical (1).pdf
3. Declaration of Emergency West Sitcum Sub 1 SH Electrical (3).pdf
4. TNT OrderConf (009).pdf
5. 070759 Auto and PL Insurance Ex. 7.25.2018.pdf
6. 070759 CGL Insurance Ex. 10.01.2018.pdf
7. 070759 Emergency PSA West Sitcum Sub 1 SH Electrical (2).pdf
8. 070759 Emergency PSA West Sitcum Sub 1 SH Electrical (1).pdf
9. 00 52 00-AGREEMENT FORM EMERGENCY.pdf
10. 00 61 13_13 PORT-PERFORMANCE BOND.pdf
11. 00 61 13_16 PORT-Payment Bond.pdf
12. 00 72 00-GENERAL CONDITIONS.pdf
13. 00 73 16-INSURANCE REQUIREMENTS.pdf
14. 00 73 46-PREVAILING WAGE RATES.pdf
15. 00 73 63-SECURITY REQUIREMENTS.pdf
16. 070772 Executed Agreement.pdf
17. 070772 Insurance Certificate.pdf
18. 070772 Notice of Award - Notice to Proceed.pdf
19. 070772 Notice of Award - Notice to Proceed.pdf
20. 070772 Project Manual.pdf
February 26, 2019, 8:27pm
Document(s) Released to Requester   Details Public
1. RFQ West Sitcum Stormwater Treatment 201024.01 Comments (3).pdf
2. RFQ West Sitcum Stormwater Treatment 201024.01.pdf
3. Sign In Sheet - 90 Percent Design Review - West Sitcum Stormwater Treatment Project (Completed).pdf
4. WA MWS Submittal - NWSA-Port of Tacoma-West Sitcum Stormwater Treatment, Tacoma, Wa - 03-23-18.pdf
5. West Sitcum 30% plans - binder.pdf
6. West Sitcum Basin A - Notice to Proceed.pdf
7. West Sitcum Basin B - Notice to Proceed.pdf
8. West Sitcum Basin C - Notice to Proceed.pdf
9. West Sitcum paving_reefer area_10.18.17.pdf
10. West Sitcum Reefer Rows Paving Repairs 201035.01 $175K.pdf
11. West Sitcum Stormwater Treatment Drawing S05.pdf
12. West Sitcum Stormwater Treatment Drawing S05_S06.pdf
13. West Sitcum Stormwater Treatment Drawing S06.pdf
14. West Sitcum Stormwater Treatment Dwg S05_S06-signed.pdf
15. West Sitcum SW.10.6.17mpp.pdf
16. West Sitcum Terminal (APMT) Stormwater Treatment 201024.01 $300K.pdf
17. West Sitcum Terminal Legal Survey 20-6005-00-1116-01 $13K.pdf
18. West Sitcum Terminal Legal Survey 20-6005-08-0000-00 $7K+13K=20K.pdf
19. West Sitcum_SWPumpStationsAdvanceProcurement.pdf
20. West Sitcum_TreatmentSystemsAdvanceProcurement.pdf
21. West Sitcum_TreatmentSystemsAdvanceProcurement.pdf
22. West Sitcum_Vortex-TypeHDSAdvanceProcurement.pdf
23. Advance Procurement West SitcumTerminal Wike-Memo.pdf
February 12, 2019, 8:16pm
Document(s) Released to Requester   Details Public
1. 2018-03-27 JShawyer West Sitcum tide gate estimate.pdf
1a. 2018-03-27 SSA Outfall Valves Estimate.pdf
2. 2018-04-06 Bid Set West Sitcum - Cons.Dwgs (1).pdf
3. 2018-04-25 - 90 Percent Review Comments - West Sitcum Stormwater Treatment Project (3-05-2018)(FINAL HBW 5-15-2018).pdf
4. 2018-04-27 Bid Set West Sitcum - Cons.Dwgs Signed C Reduced.pdf
5. 2018-04-27 Bid Set West Sitcum - Cons.Dwgs Signed C.pdf
6. 2018-04-27 Bid Set West Sitcum - Cons.Dwgs Signed D Reduced.pdf
7. 2018-04-27 Bid Set West Sitcum - Cons.Dwgs Signed D.pdf
8. 2018-04-27 Bid Set West Sitcum - Cons.Dwgs Signed E Reduced.pdf
9. 2018-04-27 Bid Set West Sitcum - Cons.Dwgs Signed E.pdf
10. 2018-04-27 Bid Set West Sitcum - Cons.Dwgs Signed G Reduced.pdf
11. 2018-04-27 Bid Set West Sitcum - Cons.Dwgs Signed G.pdf
12. 2018-04-27 Bid Set West Sitcum - Cons.Dwgs Signed M Reduced (1).pdf
13. 2018-04-27 Bid Set West Sitcum - Cons.Dwgs Signed S Reduced.pdf
14. 2018-04-27 Bid Set West Sitcum - Cons.Dwgs Signed S.pdf
15. 2018-05-01 CStraka 201053.01 West Sitcum Tide Gate Replacements (1).pdf
15a. QUOTATION.pdf
16. . Prebid Meeting - West Sitcum Stormwater Treatment Project (Meeting Minutes).pdf
17. 30 Percent Review Comments - West Sitcum Stormwater Treatment Project (12-12-2017).pdf
18. 5753 West Sitcum Tide Gate - Port of Tacoma_TT CheckMate_48 inch.pdf
19. 90 Percent Design Review - West Sitcum Stormwater Treatment Project (Meeting Agenda).pdf
20. 90 Percent Design Review - West Sitcum Stormwater Treatment Project (Meeting Minutes).pdf
21. 90 Percent Design Review - West Sitcum Stormwater Treatment Project (Sign-In Sheet).pdf
22. 90 Percent Review Comments - West Sitcum Stormwater Treatment Project (3-05-2018).pdf
23. 90 Percent Review Comments - West Sitcum Stormwater Treatment Project (BRIAN ARCHER).pdf
24. 90 Percent Review Comments - West Sitcum Stormwater Treatment Project.pdf
25. Advance Procurement West Sitcum Stormwater Wike-Pres (with Notes).pdf
26. Advance Procurement West SitcumTerminal Wike-Memo.pdf
27. Attachment-Agreed Order West Sitcum Terminal.pdf
28. Bulletin Detail Report_ 070664 (2018) West Sitcum Stormwater Treatment.pdf
29. Bulletin Detail Report_ 201024.01 - West Sitcum Stormwater Treatment Advertisement.pdf
30. Const Auth West Sitcum Terminal Stormwater Treatment Wike-Memo.pdf
31. Const Auth West Sitcum Terminal Stormwater Treatment Wike-Pres.pdf
32. Copy of 2018-01-26 nwsa west sitcum pre-procurement cost estimates.pdf
33. Copy of 30 Percent Review Comments - West Sitcum Stormwater Treatment Project PMX Responses.pdf
34. Copy of Review Comment Responses form West Sitcum -AF.pdf
35. Word Letterhead Template.pdf
36. Word Letterhead Template.pdf
37. Declaration of Emergency West Sitcum Sub 1 SH Electrical.pdf
38. Division 00 - West Sitcum Stormwater Treatment (4-04-2018).pdf
39. Division 01 - West Sitcum Stormwater Treatment (4-04-2018).pdf
40. Independant Survey Estimate West Sitcum Field Work.pdf
41. Independant Survey Estimate West Sitcum Field Work.pdf
42. Meeting Agenda - 90 Percent Design Review - West Sitcum Stormwater Treatment Project (Final).pdf
43. Meeting Minutes - 90 Percent Design Review - West Sitcum Stormwater Treatment Project (Completed).pdf
44. Parametrix Answers Q&A 02 - West Sitcum Stormwater Treatment.pdf
44a. 070916 Q&A 02.pdf
45. RE_ Task Order for On-call survey West Sitcum Terminal Legal Description (1).pdf
45a. West Sitcum Terminal Legal Survey 20-6005-00-1.pdf
45b. RE_ Executive Authorization NWSA-20170914.01 – West Sitcum Terminal Legal Survey.pdf
January 29, 2019, 7:17pm
Document(s) Released to Requester   Details Public
1. 070664 DJC Ad - 201024.01 West Sitcum Stormwater Treatment.pdf
2. 070664 DJC Ad - 201024.01 West Sitcum Stormwater Treatment (1).pdf
3. 070664 Question - (West Sitcum Stormwater Treatment.pdf
4. 070664 RFQ West Sitcum Stormwater Treatment 201024.01.pdf
5. 070664 West Sitcum Stormwater Treatment Civil Drawings A.pdf
6. 070664 West Sitcum Stormwater Treatment Civil Drawings.pdf
7. 070664 West Sitcum Stormwater Treatment Demolition Drawing A.pdf
8. 070664 West Sitcum Stormwater Treatment Demolition Drawing.pdf
9. 070664 West Sitcum Stormwater Treatment Electrical Drawings.pdf
10. 070664 West Sitcum Stormwater Treatment Electrical Drawings A.pdf
11. 070664 West Sitcum Stormwater Treatment General Drawings A.pdf
12. 70664 West Sitcum Stormwater Treatment Mechanical Drawings A.pdf
13. 070664 West Sitcum Stormwater Treatment General Drawings A (1).pdf
14. 070664 West Sitcum Stormwater Treatment Mechanical Drawings A (1).pdf
15. 070664 West Sitcum Stormwater Treatment Mechanical Drawings.pdf
16. 070664 West Sitcum Stormwater Treatment Stormwater Drawings A.pdf
17. 070664 West Sitcum Stormwater Treatment Stormwater Drawings.pdf
18. 070759 Emergency PSA West Sitcum Sub 1 SH Electrical.pdf
19. 070759 Emergency PSA West Sitcum Sub 1 SH Electrical.pdf
20. 070916 - West Sitcum Stormwater Treatment - Preconstruction Meeting Agenda.pdf
21. 070916 - West Sitcum Stormwater Treatment - Preconstruction SignIn Sheet.pdf
22. West Sitcum Stormwater Treatment - Prebid Meeting Agenda.pdf
23. 2017-148 HWA Const Insp Scope - West Sitcum [Port Comments 4-17-2018].pdf
24. 2017-148 West Sitcum Final Report.pdf
25. 2018-01-31 90% Permit Set West Sitcum - Construction Plans.pdf
25.1 Home.html
26. 2018-02-13 West Sitcum 90% eopc.pdf
27. 2018-03-02 JShawyer West Sitcum Terminal (formerly APMT) Tide Valve Removal (1).pdf
27.2. Photos and product data.pdf
27.3 Red Valve TF-1 Catalog Cut Sheet.pdf
27.4 Reference Drawings.pdf
28. 2018-03-06 AFichthorn RE_ West Sitcum Terminal (formerly APMT) Tide Valve Removal (1).pdf
29. 2018-03-06 JShawyer West Sitcum Terminal (formerly APMT) Tide Valve Removal (1).pdf
29.1 Outfall.pdf
30. 2018-03-06 JShawyer RE_ West Sitcum Terminal (formerly APMT) Tide Valve Removal (1).pdf
31. 2018-03-06 JShawyer1 West Sitcum Terminal (formerly APMT) Tide Valve Removal.pdf
32. 2018-03-06 JShawyer2 RE_ West Sitcum Terminal (formerly APMT) Tide Valve Removal.pdf
33. 2018-03-06 VUy RE_ West Sitcum Terminal (formerly APMT) Tide Valve Removal (1).pdf
34. 2018-03-06 VUy West Sitcum Terminal (formerly APMT) Tide Valve Removal - ESTIMATE (1).pdf
34.1 Estimate - Remove Existing Duckbill Check Valv.pdf
35. 2018-03-08 JShawyer RE_ West Sitcum Terminal (formerly APMT) Tide Valve Removal - Field Verification_Measurements.pdf
36. 2018-03-08 VUy RE_ West Sitcum Outfall Gate Replacement (1).pdf
37. 2018-03-08 VUy RE_ West Sitcum Terminal (formerly APMT) Tide Valve Removal - Field Verification_Measurements.pdf
38. 2018-03-08 VUy West Sitcum Terminal (formerly APMT) Tide Valve Removal - Field Verification_Measurements.pdf
39. 2018-03-15 JShawyer West Sitcum Outfall Gate Replacement.pdf
40. 2018-03-27 AFichthorn RE_ West Sitcum tide gate estimate.pdf
January 17, 2019, 7:01pm
Document(s) Released to Requester   Details Public
1. 2017-03-03 GWentworth PM Terminal (7).pdf
2. 2017-03-03 SKelly APMT Bullrail Power Study with Rec (1).pdf
2c. Full page photo.pdf
3. 2013_Expansion_Presentation_EMC_130411.pdf
4. 004 Figure 2_20180315.pdf
5. APMT Expansion Presentation ZT DE Asia Trip 100913.pdf
6. APMT Fender Repair.pdf
7. Lease Addendum Maersk Pacific 3_16_00 1675 Lincoln Ave. Bldg. 950 SD_ 2013-07-12_C540759.pdf
8. Scoping APMT Fender Repair.pdf
9. SMA Exemption (01-03-14), Expires 01-02-19_Pile Replacement Pgm (SHR2013-40000215154).pdf
10. Abstract APM Terminals 1675 Lincoln Ave.1_22_15 SD_ 2016-12-01_C5402164.pdf
11. HPA_Pgmtc Pile Replacement Pjt (ver.pdf
12. 2013 POT Annual Report.pdf
13. 2014 POT Annual Report.pdf
14. SWPPP from Contract - Pier 4 Site.pdf
15. Corps Sec 404 & 10, Expires 03-17-2019 (NWS-2014-0456-WRD)_Pier 4 Phase 2 Reconfiguration.pdf
16. HPA_Pgmtc Pile Replacement Pjt (ver.pdf
17. Collaborative EPA Time-Critical Sediment Removal Action.pdf
18. WQC (08-29-12), Expires 08-28-17_Pile Replacement Pgm (9244).pdf
19. AMPIP XS Liability Policy 17-18-Master.pdf
20. Shoreline Permit (07-15-15), Expires 07-14-20_Pier 4 Phase 2 Reconfigura....pdf
21. Transload+Transport+and+Disposal+Work+Plan+-+Pier+4+Rev+2.pdf
January 8, 2019, 9:14pm
Document(s) Released to Requester   Details Public
1. 016-03-02 SMiller Trident Bull Rails.pdf
2. 2016-03-16 SMiller FW_ Main Breaker 592_Bull Rails.pdf
3. 2016-04-14 JShawyer Trident noted.pdf
4. 2016-04-14 JShawyer Trident notes.pdf
5. 2016-04-26 INelson Trident.pdf
5a. Task Order Template 069934 On-Call Pier and Ma.pdf
6. 2016-04-26a INelson Trident.pdf
7. 2016-05-09 LGuenthard MID 101064.01 Pier 24_25 Bull Rail Replacement.pdf
7. a. 2016-05-09 LGuenthard MID 101064.01 Pier 24_25 Bull Rail Replacement.pdf
8. 2016-05-31 INelson Daily Report Trident.pdf
8a. 05-27-2016.pdf
9. 2016-06-01 CMiddling Daily work authorizations.pdf
9a. signed 5-31-16.pdf
9b..pdf
10. 2016-06-02 CMiddling work authorization signed.pdf
10a. igned 6-1-16.pdf
11. 2016-06-15 CMiddling all work authorizations.pdf
11. signed 6-14-16.pdf
11b. sgned 6-13-16.pdf
11c. signed 6-10-16.pdf
11d. signed 6-9-16.pdf
11e. signed 6-8-16.pdf
11f. signed 6-7-16.pdf
11g. signed 6-6-16.pdf
11h. signed 6-3-16.pdf
11i. signed 6-2-16.pdf
11j. signed 6-1-16.pdf
11k. signed 5-31-16.pdf
11l. signed 5-27-16.pdf
12. 2016-06-16 INelson RE_ Rates on Trident.pdf
13. 2016-06-20 CMiddling work authorization.pdf
13a.signed 6-16-16.pdf
13b. signed 6-15-16.pdf
14. 2016-06-23 CMiddling RE_ Trident Seafood's daily work authorization.pdf
15. signed 6-16-16.pdf
16. 2016-07-08 INelson Special Waste Express Profile Port of Tacoma.pdf
16a. Special Waste Express Profile Port of Tacoma.pdf
17. 2016-08-01 INelson RE_ Trident - Orion.pdf
17a. 20160801133104098.pdf
18. 2016-08-01 INelson Trident - Orion (1).pdf
18a. Task Order 8 Approximate 08012016.pdf
19. 2018-03-02 JShawyer West Sitcum Terminal (formerly APMT) Tide Valve Removal.pdf
19a. 2978 Port of Tacoma_TF1_48 inch.pdf
19b. Photos and product data.pdf
19c. Red Valve TF-1 Catalog Cut Sheet.pdf
20. 2018-03-06 AFichthorn RE_ West Sitcum Terminal (formerly APMT) Tide Valve Removal.pdf
21. 2018-03-06 BArcher Outfall IE.pdf
22. 2018-03-06 JShawyer West Sitcum Terminal (formerly APMT) Tide Valve Removal.pdf
22a. Outfall.pdf
December 11, 2018, 4:10pm
Document(s) Released to Requester   Details Public
1. Field Notes 6-11-15.pdf
2. First Page of APMT Drawings1.pdf
3. Second Page of APMT Drawings1.pdf
4. Summary of damage tally.pdf
5. 00 11 13 Port-ADVERTISEMENT FOR BIDS.pdf
6. 101068.01 APMT Fender Replacement.pdf
7. 4-04-17 NWSA Min (1).pdf
8. APMT Fender Repair PP.pdf
9. APMT Fender Repair Shawyer.pdf
10. APMT Fender Repair.pdf
11. APMT Fender Repair (1).pdf
12. APMT Fender Repair (2).pdf
13. APMT Fender System.pdf
14. Item 4A Memo-APMT Fender Rep.pdf
15. Item 4A Pres-APMT Fender Rep.pdf
16. Item 5C APMT Fender Rep.pdf
17. Item 5C APMT Fender Rep (1).pdf
18. Project Request Form 2016.pdf
19. Scoping APMT Fender Repair.pdf
20. 6-29-16 (2).pdf
21. 6-30-16 (6).pdf
22. On Call Task Order Track-Pier Marine Repair-Orion.pdf
23. signed 5-27-16.pdf
24. signed 6-10-16.pdf
25. signed 6-1-16.pdf
26. signed 6-13-16.pdf
27. signed 6-14-16.pdf
28. signed 6-15-16.pdf
29. signed 6-16-16.pdf
30. signed 6-20-16.pdf
31. signed 6-21-16.pdf
32. signed 6-2-16.pdf
33. signed 6-23-16.pdf
34. signed 6-24-16.pdf
35. signed 6-27-16.pdf
36. signed 6-28-16.pdf
37. signed 6-3-16.pdf
38. signed 6-6-16.pdf
39. signed 6-7-16.pdf
40. signed 6-8-16.pdf
41. signed 6-9-16.pdf
November 14, 2018, 8:27pm
Document(s) Released to Requester Public
1. 03-Programmatic Biological Evaluation.pdf
2. 170721_Exhibit B_SSAT SS.pdf
3. Construction SWPPP Short Form.pdf
4. West Sitcum Proposed Draft Order.pdf
5. 001 SPECP.pdf
October 13, 2018, 4:35pm
Document(s) Released to Requester   Details Public
1. West Sitcum_SWPumpStationsAdvanceProcurement.pdf
2. West Sitcum_Vortex-TypeHDSAdvanceProcurement.pdf
3. Deck Drain Filter Units (1).pdf
4. 070664 Prjt Man Vol 1 of 2.pdf
5. 003 Table 3.Applicable BMPs.pdf
6. 03-Programmatic Biological Evaluation.pdf
7. 2017_SSAT_Lease.pdf
8. 092877 APMT North Crane Feed Specifications_Final.pdf
9. 171002Leasev2(SSA-WestSitcum) with Exhibit A.pdf
10. 20180522_WestSitcumTidegates_combined_pkg.pdf
11. Appendix A_Permit.pdf
12. CheckMate Brochure 060515.pdf
13. Curt's Comments on SC Redline 092517.pdf
14. W Sitcum (January 2018).pdf
September 28, 2018, 4:01pm
Document(s) Released to Requester   Details Public
1. 070664 West Sitcum Stormwater Treatment Stormwater Drawings.pdf
2. 070664 West Sitcum Stormwater Treatment Stormwater Drawings.pdf
2. .Appendix C.BMPs from SWMM.pdf
4. 001 Amendment Page.updated.pdf
5. SWEngRpt_WestSitcumFinal_2018012_Print.pdf
6. Appendix A.ISGPFinal2015.pdf
7. Deck Drain Filter Units.pdf
8. 070329_TO8_ProjectChangeRequest_01.pdf
9. RE_ 070329 Task Order 07.pdf
9a. 070329 Task Order 07.pdf
10. Final IC Study_Sitcum WW CD_Hart Crowser (10-20-09).pdf
September 12, 2018, 6:58pm
Document(s) Released to Requester   Details Public
11. 2017-07-18 JBlair 101068.01 - APMT Fender Repairs- Submittal 08 - Schedule of Values.pdf
12. NWSA-20170522.01 West Sitcum Terminal (APMT) Stormwater Treatment 201024.01 Rhodes 300K.pdf
13. APMT Structrual Dwgs - Top PL Revision.pdf
14. 2017-07-18 GOlson Pier Fender Project _ APMT _ Heads Up _ Gerry.pdf
15. 2017-08-03 JBlair 101068.01 - APMT Fender Repairs - RFI 001 - Plastic Banding on Pile.pdf
16. APMT Storm Water Permit _ Notice of Termination.pdf
17. 2017-08-30 VUy APMT Fender Repairs Project - WE 09-03-2017 Water Quality Reports.pdf
18. APMT PoT HMM PNW SVC NIM TXFR AGMT TERM SHT 062912001.pdf
19. 2017-08-30 VUy RE_ APMT Pier_Fender Project _ 12-HR Shift Notice for Today (8_30_17).pdf
20. 2017-07-24 JBlair RE_ 101068.01 - APMT Fender Repairs- Submittal 10 Baseline Project Schedule.pdf
21. 2017-09-22 VUy APMT Project - Crane Cable Trench_Hatches Clean Out Operation Update.pdf
22. NWSA-20170420.01 APMT Stormwater Treatment Project 20-6005-00-1116-01 Rhodes 1.5K.pdf
23. 2017-03-08 ABergman APMT Fender Repair - Unsigned Bid Set.pdf
24. 2017-08-30 GOlson APMT Pier_Fender Project _ Late Gate Notice.pdf
25. 092877 APMT CranePwrFeed Mods S Feed Debrief 10102012.pdf
26. Prelim APMT 5kv Crane Rail Cable Connection Study.pdf
27. APMT NIM TXFR Meeting Work Scope Part 1 for SG 06112012.pdf
28. APMT Crane Rail Improvement Bid Drawings 6-19-13.pdf
30. 092877 APMT Crane Power Feed RFI #4 vault hinge 06302012.pdf
N29. WSA-20170306.01 APMT Bull Rail Power Study with Recom 20-6005-00-1116-01 Shawyer 7.5K.pdf
August 31, 2018, 1:14pm
Document(s) Released to Requester   Details Public
1. APMT Fender repair.pdf
2. 091433 APMT Route.pdf
3. APMT Maint Matrix 2002.pdf
4. Kiewit at T-7 Overflow at APMT.pdf
5. Kiewit at T-7 Overflow at APMT.pdf
6. Kiewit at T-7 Overflow at APMT.pdf
7. APMT LAYBERTH AGMT001.pdf
8. 2013_APMT_POT_North_Sea_Memo_of_Understanding.pdf
9. APMT POT MOU JAN 2013.pdf
10. Second Page of APMT Drawings1.pdf
11. APMT Preferential Use.pdf
12. 2016-06-28 LGuethardMID 101068.01 APMT Fender Replacment.pdf
12a. 101068.01 APMT Fender Replacement.pdf
13. West Sitcum Terminal (APMT) Stormwater Treatment 201024.01 $300K.pdf
14, 2010_APMT_Horizon_Agreement.pdf
15. 2017-07-25 JShawyer APMT bolting.pdf
16. APMT 7TH ADDENDUM 02_05_15.pdf
17. APMT to NIM SIM Meeting1_ScopeB.pdf
18. APMT Certificate of Insurance for NWSA.pdf
19. 101068.01 APMT Fender Replacement.pdf
20. APMT Tide Valve Repair.pdf
21. APMT Security Agreement & Addendums.pdf
22. 101068.01 APMT Fender Replacement.pdf
23. APMT_Security Agreement_110109.pdf
24. 2013_APMT_POT_Memo_of_Understanding.pdf
25. 111011-APMT Wharf Extension.pdf
26. 092911 APMT OCR Cameras & Security Master ID #.pdf
27. 2016-08-24 APMT DOE Stormwater Letter.pdf
28. 2017_APMT_Letter.pdf
29. 2016-06-21 RE_ MID APMT Fender Repairs2.pdf
30. 2010_ltr_APMT_rent_adj.pdf
31. 20130313_APMT TPU Transformer Replace and Oil.pdf
32. APMT Berthing Report 122812 112213.pdf
33. APMT Rate History Part 2.pdf
34. ltr_APMT_rent_adj_060110.pdf
35. 092877 Design Mods for APMT 5KV Crane Power.pdf
36. 2017-03-21 MFerreira RE_ APMT Bull Rail Power Investigation - Site Investigation.pdf
37. 2013_APMT_Equipment_Rental_Agreement.pdf
38. APMT LAYBERTH REPORT 4th QTR001.pdf
39. First Page of APMT Drawings1.pdf
40. 2017-06-06 SJohnson RE_ 070444 - APMT Fender Repair.pdf
41. 2011_email_Acre_Dirt_Lot_Quote_Correspondence_APMT.pdf
42. APMT_Terminal_Buildings.pdf
43. APMT West Sitcum SITE Map 082117.pdf
44. APMT to NIM SIM Meeting1_ScopeA.pdf
45. APMT HMM PNW SVC NIM TXFR AREA AGMT TERM.pdf
46. APMT Bollard Rem TI Req Initial Port Response 07022013.pdf
47. APMT 8TH ADDENDUM 05 26 15.pdf
48. APMT HMM PNW SVC NIM TXFR AREA AGMT TERM.pdf
49. APMT HMM PNW SVC NIM TXFR AREA AGMT TERM.pdf
50. Scope for APMT.pdf
51. APMT Crane Bussbar Letter.pdf
52. APMT Maint Matrix 2007.pdf
August 14, 2018, 5:19pm
Document(s) Released to Requester   Details Public
1. West Sitcum SSAT Short Term Lease 10_2_17 SD_ 2017-10-02_C5402371.pdf
2. 072417 Lease(SSA-Sitcum)- CS markup.pdf
3. 072517 Lease(SSA-Sitcum)- Thru Section 15 Clean.pdf
4. 072517 Lease(SSA-Sitcum)- Thru Section 21 Clean.pdf
5. 072617 Lease Draft (SSA-West Sitcum)-Clean.pdf
6. 136501429_1.pdf
7. 170721Lease(SSA-Sitcum)- RK markup.pdf
8. 170725.2142Lease(SSA-Sitcum)s.pdf
9. 170725_Exhibit B_SSAT (2).pdf
10. 170905_WSitcumTerm_Exhibit A NWSA Area -DRAFT X Brian A.pdf
11. 170908LetterOfCredit(SSA-WSitcum)-BA-RKmarkup.pdf
12. 170917Lease(SSA-WestSitcum)-CES CHE Tier 4i - markup.pdf
13. 170919Lease(SSA-WestSitcum)-NWSA RK markup.pdf
14. 171004_BA_NWSA_Area@WST.pdf
15. 180123_WestSitcumTerminal Exhibit A1 (1).pdf
16. 2017_SSA_Short_Term_Lease.pdf
17. 2017_SSAT_Lease.pdf
18. 2018_Cover_Letter_New_Exhibit.pdf
19. 2018_Cover_Letter_New_Exhibit (1).pdf
20. 2018_SSAT_Lease_Abstract.pdf
21. Documents called out in Exhibit B (4).pdf
22. Exhibit C Draft Tacoma Checklist and Port Items.pdf
23. Figures from Final IC Study_Sitcum WW CD_Hart Crowser (10-20-09).pdf
24. SSA West Sitcum Lease Security LC Draft 08242017.pdf
25. SSA West Sitcum Term Sheet Draft 08022017.pdf
26. SSA West Sitcum Term Sheet Draft 09122017.pdf
27. SSA West Sitcum Term Sheet Draft TZ 07212017.pdf
27. terminal maintenance services matrix.pdf
28. West Sitcum Lease Negotiation Task List 080217.pdf
29. West Sitcum Lease TZ2.pdf
30. West Sitcum Lease TZ2.pdf
31. West Sitcum Lease V3 072717.pdf
32. West Sitcum Terminal Premises Footprint Draft V3 (1).pdf
33. WestSitcumEnvironmental (1).pdf
34. WestSitcumSafetyStructures (2).pdf
35. WestSitcumStormwaterPower (1).pdf
36. WestSitcumWaterSewer (2).pdf
August 2, 2018, 5:44pm
Document(s) Released to Requester   Details Public
1. SSA Monthly Update.pdf
2. SSAT Lease Agreement Timeline.pdf
3. Exhibit A 092917 SSAT170905_WestSitcumTerminal.pdf
4. Exhibit D Redline Serena 092917.pdf
5. Lease(SSA-WSitcum)-markup.pdf
6. SSAT October 2017 Invoice.pdf
7. SSAT Signature Page Signed.pdf
8. SSAT West Sitcum Exhibit D Final 100217.pdf
9. SSAT West Sitcum Short Term Lease Signed 100217.pdf
10. SSAT.FINAL171003Lease(SSA-WestSitcum)-clean.pdf
11. WEST SITCUM (SSAT) Signed LEASE 10.06.17 (1).pdf
12. Lease(SSA-WSitcum-MTM).pdf
13. SSA West Sitcum Term Sheet Draft 10022017.pdf
July 19, 2018, 3:54pm
Document(s) Released to Requester   Details Public
1. Documents called out in Exhibit B.pdf
2. SSAT Lease Abstract 101317 NWSA.pdf
3. WEST SITCUM (SSAT) Signed LEASE 10.06.17.pdf
4. 170725_Exhibit B_SSAT.pdf
5. 20170913 Survey Estimate.pdf
6. Exhibit A - SSAT_V3_08302017.pdf
7. Matson Sublease Exhibit A and B.pdf
8. Needed Maps.pdf
9. NWSA Area Legal Description_20171021draft.pdf
10. NWSA Exhibit A and B.pdf
11. SSA Exhibit A and B.pdf
12. WestSitcumEnvironmental.pdf
13. WestSitcumSafetyStructures (1).pdf
14. WestSitcumStormwaterPower.pdf
15. WestSitcumWaterSewer.pdf
16. #137113464v2_LEGAL_ - October Lease (SSC 9_29_17).pdf
17. 16-19 NWSA_SSAT_TT Club Liab Cert.pdf
18. 170725_Exhibit B_SSAT (1).pdf
19. 171002 V2 Lease (SSA-WestSitcum)-markup xRK.pdf
20. 171002Lease(SSA-WestSitcum)-markup xRK.pdf
21. 171002Leasev2(SSA-WestSitcum) with Exhibit A.pdf
22. 171003_WestSitcumTerminal Exhibit A Final 100317.pdf
23. 171003_WestSitcumTerminal.pdf
24. 17-18 NWSA_SSAT_Auto and Excess Cert.pdf
25. 17-18 NWSA_SSAT_Pollution Cert.pdf
26. 180123_WestSitcumTerminal Exhibit A1.pdf
27. 2017 Northwest Seaport Alliance.pdf
28. Documents called out in Exhibit B (1).pdf
July 6, 2018, 5:02pm
Document(s) Released to Requester   Details Public
1. 070444 Pre-Bid Sign In.pdf
2. 070444 Pre-Bid Mtg Agenda.pdf
3. 101068.01 APMT Fender Repairs.pdf
4. Addenda # 1 00 11 13 Port-ADVERTISEMENT FOR BIDS.pdf
5. Addenda # 1 00 11 13 Port-ADVERTISEMENT FOR BIDS (1).pdf
6. Addendum 1 APMT Fender Repair.pdf
7. Addendum 1 APMT Fender Repair (1).pdf
8. 00 01 10 SHAW-Table of Contents.pdf
9. 00 01 10 SHAW-Table of Contents (1).pdf
10. 00 41 00 PORT-BID FORM.pdf
11. 00 41 00 PORT-BID FORM (1).pdf
12. Retainage.pdf
13. 00 61 23_13 Port Retainage Escrow Agreement.pdf
14. 00 63 25 Substition Request During Constuction.pdf
15.01 70 00 PORT-EXECUTION AND CLOSEOUT REQUIREMENTS _r_.pdf
16. 01 77 00 Port-CLOSEOUT PROCEDURES.pdf
17. Addendum 2 APMT Fender Repair.pdf
18. Addendum 2 Cover Sheet APMT Fender Repair.pdf
19. Addendum 2 Cover Sheet APMT Fender Repair (1).pdf
20. 070444 HOLDERS LIST 06.06.17.pdf
21. 070444 HOLDERS LIST 06.06.17.pdf
22. 070444 HOLDERS LIST 06.14.17.pdf
23. 070444 HOLDERS LIST 06.06.17.pdf
24. 070444 American Construction Bid Question.pdf
25. 070444 Hamilton Contruction Bid Questions 06-13-17.pdf
26. 070444 Q&A 01.pdf
27. 070444 Q&A 01.pdf
28. 070444 Q&A 02.pdf
29. Manson - Insurance - APMT questions.pdf
30. Manson - Project Example Sheets.pdf
31. 01 70 00 PORT-EXECUTION AND CLOSEOUT REQUIREMENTS _r_ (1).pdf
32. 01 77 00 Port-CLOSEOUT PROCEDURES (1).pdf
33. 2017-04-28 Engineers Estimate in Bid Tab.pdf
34. Appendix A_Permit.pdf
35. Approval to Advertise Project-rev 2016.07.12.pdf
36. HPA 2016-6-119+01_ProgPile.pdf
37. SJ 070444 Spec Review.pdf
38. 070444 Bid Results.pdf
39. 070444 Bid Tab.pdf
40. 070444 Bid Tab.pdf
41. 070444 Preliminary Bid Results.pdf
42. American Construction.pdf
43. Bergerson Construction.pdf
44. Hamilton Construction.pdf
45. Manson Construction.pdf
46. Quigg Bros.pdf
47. Rognlin's.pdf
48. Appendix A_Permit (1).pdf
49. PROJECT INFORMATION 8.pdf
50. 2017-05-15 Approval to Advertize (executed).pdf
51. PROJECT INFORMATION 1.pdf
52. PROJECT INFORMATION 2.pdf
53. PROJECT INFORMATION 3.pdf
54. PROJECT INFORMATION 4.pdf
55. PROJECT INFORMATION 5.pdf
56. PROJECT INFORMATION 6.pdf
57. PROJECT INFORMATION 7.pdf
58. PROJECT INFORMATION 8 (1).pdf
59. 01-USACE Section of Permits.pdf
60. 02-HPA.pdf
61. 03-Programmatic Biological Evaluation.pdf
62. 04-Essential Fish Habitat.pdf
63. 05-Figures-1.pdf
64. 06-Compliance Form.pdf
65. 07-Marine Mammal Monitoring Plan.pdf
66. 08 Species List.pdf
67. 070444-G1-1 (1).pdf
68. 070444-S1-0.pdf
69. 070444-S1-1.pdf
70. 070444-S2-0.pdf
71. 070444-S2-1.pdf
72. 070444-S2-2.pdf
73. 070444-S3-0.pdf
74. 070444-S3-1.pdf
75. 070444-S4-0.pdf
76. 070444-S4-1.pdf
77. 2017-05-23 APMT Fender Repair IFB (signed) (1).pdf
78. 2017-05-23 APMT Fender Repair IFB1 (signed).pdf
June 22, 2018, 12:11pm
Document(s) Released to Requester   Details Public
67132 -- Check # 191086 NRC ENV SERVICES Vendor # 010789_C743840.pdf
70315 -- Check # 192772 INTERSTATE PROD Vendor # 111665_C7432616.pdf
70315 -- Check # 192772 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7432616.pdf
72485 -- Check # 193991 INTERSTATE PROD Vendor # 111665_C7433952.pdf
72485 -- Check # 193991 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7433952.pdf
73073 -- Check # 194324 INTERSTATE PROD Vendor # 111665_C7434185.pdf
73073 -- Check # 194324 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7434185.pdf
73264 -- Check # 194456 INERSTATE PROD Vendor # 111665_C7434324.pdf
73264 -- Check # 194456 Vendor Name_ INERSTATE PRODUCTS Vendor # 111665_C7434324.pdf
73577 -- Check # 194643 INTERSTATE PROD Vendor # 194643_C7434518.pdf
73577 -- Check # 194643 Vendor Name_ INTERSTATE PRODUCTS Vendor # 194643_C7434518.pdf
78806 -- Check # 197270 INTERSTATE PROD Vendor # 111665_C7661610.pdf
78806 -- Check # 197270 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7661610.pdf
80262 -- Check # 198143 INTERSTATE PROD Vendor # 111665_C7662513.pdf
80262 -- Check # 198143 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7662513.pdf
82817 -- Check # 199809 INTERSTATE PROD Vendor # 111665_C7664050.pdf
82817 -- Check # 199809 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7664050.pdf
87147 -- Check # 203147 SHOPE CONCRETE PROD Vendor # 000619_C8351618.pdf
87185 -- Check # 203115 INTERSTATE PROD Vendor # 111665_C8351586.pdf
87185 -- Check # 203115 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C8351586.pdf
87714 -- Check # 203401 INTERSTATE PROD Vendor # 111665_C8351878.pdf
87714 -- Check # 203401 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C8351878.pdf
93467 -- Check # 206734 SHOPE CONCRETE PROD Vendor # 000619_C85969.pdf
93467 -- Check # 206734 Vendor Name_ SHOPE CONCRETE PRODUCTS Vendor # 000619_C85969.pdf
93608 -- Check # 206908 EVERSON'S ECON-VAC Vendor # 007188_C859125.pdf
93608 -- Check # 206908 Vendor Name_ EVERSON'S ECON-VAC Vendor # 007188_C859125.pdf
95370 -- Check # 208026 INTERSTATE PRODUCTS Vendor # 111665_C859937.pdf
95370 -- Check # 208026 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C859937.pdf
96466 -- Check # 208604 INTERSTATE PRODUCTS Vendor # 111665_C8591449.pdf
96466 -- Check # 208604 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C8591449.pdf
98870 -- Check # 209709 SHOPE CONCRETE PRODUCTS Vendor # 000619_C8592603.pdf
100277 -- Check # 210286 INTERSTATE PRODUCTS Vendor # 111665_C8593368.pdf
100277 -- Check # 210286 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C8593368.pdf
102211 -- Check # 211457 SHOPE CONCRETE PRODUCTS Vendor # 000619_C8594424.pdf
105503 -- Check # 212875 INTERSTATE PRODUCTS Vendor # 111665_C7331510.pdf
105503 -- Check # 212875 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7331510.pdf
107319 -- Check # 213780 INTERSTATE PRODUCTS Vendor # 111665_C7332273.pdf
107319 -- Check # 213780 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7332273.pdf
109317 -- Check # 215391 INTERSTATE PRODUCTS Vendor # 111665_C7333172.pdf
109317 -- Check # 215391 Vendor Name_ INTERSTATE PRODUCTS Vendor # 111665_C7333172.pdf
June 8, 2018, 4:40pm
Document(s) Released to Requester Public
!2017March5 Level3 CorrectiveActionEngineeringRpt APM Terminals (1).pdf
2. 201024.01 APMT Stormwater System.pdf
May 18, 2018, 4:56pm
Document(s) Released to Requester   Details Public
1. APM0000813.pdf
2. APM0000868.pdf
3. APM0000873.pdf
4. APM0000878.pdf
5. APM0000883.pdf
6. APM0000892.pdf
7. APM0000899.pdf
8. APM0000905.pdf
9. APM0000916.pdf
10. APM0000929.pdf
11. APM0000987.pdf
12. APM0001019.pdf
13. APM0001029.pdf
14. APM0001138.pdf
15. APM0001141.pdf
16. APM0001203.pdf
17. APM0001265.pdf
18. APM0001272.pdf
19. APM0001278.pdf
20. APM0001336.pdf
21. APM0001347.pdf
22. APM0001401.pdf
23. APM0001413.pdf
24. APM0001462.pdf
25. APM0001510.pdf
26. APM0001550.pdf
May 3, 2018, 6:24pm
Document(s) Released to Requester   Details Public
AMPT SWPPP.pdf
APM0000040.pdf
APM0000046.pdf
APM0000053.pdf
APM0000060.pdf
APM0000063.pdf
APM0000117.pdf
APM0000118.pdf
APM0000125.pdf
APM0000131.pdf
APM0000132.pdf
APM0000138.pdf
APM0000145.pdf
APM0000152.pdf
APM0000158.pdf
APM0000213.pdf
APM0000491.pdf
APM0000511.pdf
APM0000614.pdf
APM0000648.pdf
APM0000655.pdf
APM0000662.pdf
APM0000668.pdf
APM0000675.pdf
APM0000742.pdf
April 20, 2018, 3:15pm
Document(s) Released to Requester   Details Public
1.SAT West Sitcum Project Status.pdf
1a. SSA West Sitcum Term Sheet Draft TZ 07212017.pdf
1b. West Sitcum Lease Negotiation Task List 08021.pdf
2. 9-05-17-Agenda NWSA Exec Session.pdf
3. ER _Review_.pdf
4. FW_ Letter to Ecology re Milwaukee Terminal(1).pdf
5. FW_ Washington State Dept of Ecology notificati....pdf
5a. Cover Letter APMTerminalsTacomaLLC Friday June.pdf
5b. Copy of Record APMTerminalsTacomaLLC Friday Ju.pdf
6. Engineering Report for Milwaukie Terminal.pdf
April 13, 2018, 12:26pm
Document(s) Released to Requester   Details Public
1. a.West Sitcum Lease V2.pdf
1. b.West Sitcum Lease V2.pdf
1. Draft and Confidential_ West Sitcum Lease.pdf
2. FW_ Draft and Confidential_ Revised term sheet - West Sitcum Terminal lease.pdf
3. 9-05-17 AGENDA REVIEW .pdf
3.a. 9-05-17 DRAFT NWSA Public mtg pckt.pdf
4. 9-05-17 DRAFT AGENDA REVIEW (2).pdf
4. a. 9-05-17 DRAFT NWSA PUBLIC MTG (2).pdf
5. 9-05-17 DRAFT NWSA AGENDA REVIEW (4).pdf
5.a 9-05-17 DRAFT NWSA PUBLIC MTG (3).pdf
6. West Sitcom Lease Review.pdf
7. West Sitcom Lease Review.pdf
March 27, 2018, 8:54pm
Document(s) Released to Requester   Details Public
10. 4.14.17.STAFF BRIEFINGS PKT.pdf
11. NWSA Strategic Calendar.pdf
12. Draft and Confidential_ Revised term sheet - West Sitcum Terminal lease.pdf
13. RE_ West Sitcum Lease Exhibit B.pdf
14. ATTY-CLIENT Port of Tacoma _ SSA - Sitcum Lease.pdf
15. RE_ West Sitcum Terminal SSAT Lease Term Sheet Vetting.pdf
16. RE_ West Sitcum Terminal SSAT Lease Term Sheet Vetting.pdf
17. RE_ West Sitcum Terminal SSAT Lease Term Sheet Vetting.pdf
18. FW_ West Sitcum Terminal SSAT Lease Term Sheet Vetting.pdf
19. RE_ West Sitcum Terminal SSAT Lease Term Sheet Vetting.pdf
2. Draft and Confidential_ West Sitcum Lease.pdf
3. West Sitcum Lease V2 (2).pdf
4. 072617 Lease Draft (SSA-West Sitcum)-Clean.docx.pdf
5. Lease draft.pdf
6. Draft and Confidential_ West Sitcum Lease.pdf
7. West Sitcum Lease V2.pdf
8. NWSA Staff Briefings 4-14-17.pdf
9. NWSA Look Ahead.pdf
March 12, 2018, 6:37pm
Document(s) Released to Requester   Details Public
1. West Sitcum Terminal.pdf
10. West Sitcum Lease Negotiation Task List 08021.pdf
11. West Sitcum SSAT Lease NWSA MM Meeting Task L.pdf
12. SSA West Sitcum Term Sheet Draft 08022017.pdf
13. RE_ West Sitcum Terminal Lease Draft.pdf
14. RE_ ATTY-CLIENT Port of Tacoma _ SSA - West Sitcum Lease.pdf
15. 170725.2142Lease(SSA-Sitcum)-RKmarkup_DDedits.pdf
16. ATTY-CLIENT Port of Tacoma _ SSA - West Sitcum Lease.pdf
17. 170725.2142Lease(SSA-Sitcum)-RKmarkup.pdf
18. west sitcum terminal lease.pdf
19. RE_ West Sitcum Lease Exhibit B.pdf
2. West Sitcum Terminal Lease Review.pdf
20. Proposed SSAT West Sitcum Lease Premises.pdf
21. West Sitcum Terminal Premises Footprint Draft V1 (2).pdf
3. RE_ SSAT West Sitcum Rate Proposal.pdf
4. NWSA Lease Security Bond Template.pdf
5. NWSA Lease Security Letter of Credit Template.pdf
6. RE_ SSAT West Sitcum Rate Proposal.pdf
7. RE_ SSAT West Sitcum Rate Proposal.pdf
8. SSAT West Sitcum Rate Proposal Draft 080817.pdf
9. SSAT West Sitcum Project Status.pdf
February 13, 2018, 5:34pm
Document(s) Released to Requester Public
170926. PSK. Comment letter to Ecy re Port of Tacoma.pdf
2017-09-27 BMP installation progres photos.pdf
January 24, 2018, 10:13pm
Document(s) Released to Requester   Details Public
1. FW_ Next Steps_ West Sitcum Terminal.pdf
10. West Sitcum Terminal Lease Review(5).pdf
11. West Sitcum Terminal Lease Review(6).pdf
12. West Sitcum Terminal Lease Review(7).pdf
13. West Sitcum Terminal Lease Review(8).pdf
14. West Sitcum Terminal Lease Review(9).pdf
15. West Sitcum Terminal Lease Review(10).pdf
16. West Sitcum Terminal Lease Review(11).pdf
17. West Sitcum Terminal Lease Review(12).pdf
18. West Sitcum Terminal Lease Review(13).pdf
19. West Sitcum Terminal Lease Review(14).pdf
19. West Sitcum Terminal Lease Review(15).pdf
2. ResponseToEcologyFinaldraft.pdf
20. West Sitcum Terminal Lease Review(16).pdf
21. West Sitcum Terminal Lease Review(17).pdf
22. West Sitcum Terminal Lease Review(18).pdf
23. West Sitcum Terminal Lease Review(19).pdf
24. west sitcum terminal lease.pdf
25. Almost Final language for SSA.pdf
26. Draft and Confidential_ Revised term sheet - We....pdf
27. FW_ Draft and Confidential_ Revised term sheet ....pdf
28. Next Steps_ West Sitcum Terminal.pdf
29. Draft and Confidential_ West Sitcum Lease.pdf
29a. West Sitcum Lease V2.pdf
29b. West Sitcum Lease TZ2.pdf
2a. 072617 Lease Draft (SSA-West Sitcum)-Clean.pdf
3a. 072617 Lease Draft (SSA-West Sitcum)-Clean.pdf
4. West Sitcum Terminal Lease Review.pdf
5. West Sitcum Terminal Lease Review(1).pdf
6. West Sitcum Terminal Lease Review(2).pdf
7. West Sitcum Terminal Lease Review(3).pdf
8. Draft and Confidential_ West Sitcum Lease.pdf
8a. West Sitcum Lease.pdf
9. West Sitcum Terminal Lease Review(4).pdf
January 9, 2018, 6:45pm
Document(s) Released to Requester   Details Public
1. SSAT West Sitcum Project Status.pdf
1. West Sitcum Lease Negotiation Task List 08021.pdf
10. Lease Draft (SSA-West Sitcum) 072117.pdf
11. Lease Draft (SSA-West Sitcum) 072117.docx(1).pdf
11.1 Lease Draft (SSA-West Sitcum) 072117.pdf
12. Proposed SSAT West Sitcum Lease Premises.pdf
12.1 West Sitcum Terminal Premises Footprint Draft.pdf
13. APM Terminals Pacific_030183.pdf
14. APMT 1ST ADDENDUM 03_01_83.pdf
15. APMT 2nd ADDENDUM 03_01_83.pdf
16. APMT 3RD ADDENDUM 03_16_00.pdf
17. APMT LEASE 4TH ADDENDUM 11.21.14.pdf
18. APMT 5TH ADDENDUM 12_10_14.pdf
19. APMT 6TH ADDENDUM 01_13_15.pdf
2.SSA West Sitcum Term Sheet Draft TZ 07212017.pdf
20. APMT 7TH ADDENDUM 02_05_15.pdf
21. APMT 8TH ADDENDUM 05.26.15.pdf
22. APMT ASSIGNMENT LETTER 10_25_14.pdf
23. APMT_Pacific_Name_Amend_050103.pdf
3. West Sitcum SSAT Lease NWSA MM Meeting Task L.pdf
4. RE_ West Sitcum Terminal.pdf
5. FW_ Draft and Confidential_ Revised term sheet ....pdf
6. SSA West Sitcum Term Sheet Draft 07202017.pdf
7. RE_ West Sitcum Lease Exhibit B.pdf
8. Who Owns the SW System Upon Completion - RE_ We....pdf
9. RE_ Final language for SSA.pdf
December 28, 2017, 4:16pm
Document(s) Released to Requester   Details Public
APMT Stormwater Grid Map.pdf
APMT Tacoma _ Gerry _ Question.pdf
APMTdrafty property profile.pdf
APMTStorm waterv2 (2).pdf
APMTStorm waterv2.pdf
Draft document1.pdf
FW_ DOE.pdf
Letter to Ecology RE APMT.1.pdf
Master Id Request Form_APMT Stormwater Treatm.pdf
Milwaukie Terminal.pdf
my comments.pdf
NPDES and New MTO.a.pdf
NPDES and New MTO.pdf
POT Letter to DOE _ APMT AO.pdf
Project Authorization for Stormwater System.pdf
Re_ A loss for Tacoma.pdf
RE_ Action Item updates.pdf
RE_ AMT Stormwater.pdf
RE_ APM Terminals _ AO _ April Facility Inspection.pdf
RE_ APM Terminals.pdf
RE_ APMT Stormwater (1).pdf
RE_ APMT Stormwater .pdf
RE_ APMT Stormwater Grid Map.pdf
RE_ APMT Stormwater System(1).pdf
RE_ APMT Stormwater System(2).pdf
Re_ APMT Stormwater System.a.pdf
RE_ APMT Stormwater System.pdf
RE_ APMT Stormwater.pdf
Re_ APMT Tacoma _ Gerry _ Question(1).pdf
Re_ APMT Tacoma _ Gerry _ Question.pdf
RE_ APMT(1).a.pdf
Re_ APMT(1).pdf
RE_ APMT(2).pdf
RE_ APMT(3).pdf
RE_ APMT(4).pdf
RE_ APMT(5).pdf
RE_ APMT(6).pdf
RE_ B_A or commission(2).pdf
RE_ Cost Proposal(1).pdf
RE_ Cost Proposal.pdf
Re_ Document1 (002).docx.pdf
RE_ DOE.pdf
RE_ Engineering Report for Milwaukie Terminal(1).pdf
Re_ Engineering Report for Milwaukie Terminal.pdf
RE_ Gerry with APM.a.pdf
RE_ Gerry with APM.pdf
Re_ Letter to Ecology RE APMT(1).pdf
RE_ Letter to Ecology RE APMT.1.pdf
RE_ Letter to Ecology RE APMT.pdf
RE_ Letter to Ecology re Milwaukee Terminal(1).pdf
RE_ Letter to Ecology re Milwaukee Terminal.pdf
RE_ matson(1).pdf
RE_ matson(2).pdf
RE_ matson(3).pdf
RE_ matson.pdf
RE_ Milwaukie Terminal(1).pdf
RE_ Milwaukie Terminal.pdf
RE_ NPDES and New MTO(1).pdf
RE_ NPDES and New MTO.pdf
RE_ OA for APMT Stormwater_.pdf
RE_ Q1 2017 Stormwater Sampling Results _ Two ...(1).pdf
RE_ Q1 2017 Stormwater Sampling Results _ Two ...(2).pdf
RE_ Q1 2017 Stormwater Sampling Results _ Two ...(3).pdf
RE_ Q1 2017 Stormwater Sampling Results _ Two ...(4).pdf
RE_ Q1 2017 Stormwater Sampling Results _ Two ....pdf
RE_ ResponseToEcology.docx(1).pdf
RE_ ResponseToEcology.docx(2).pdf
RE_ ResponseToEcology.docx(6).pdf
RE_ ResponseToEcology.docx.pdf
RE_ Shape file for a shoreline permit(1).pdf
RE_ Shape file for a shoreline permit(2).pdf
RE_ Shape file for a shoreline permit.pdf
RE_ Sole Source for Stormwater Treatment.pdf
RE_ Transfer Paperwork(1).pdf
RE_ Transfer Paperwork.pdf
RE_ Washington State Dept of Ecology notificati....pdf
ResponseToEcology.2.pdf
ResponseToEcology.cmr.pdf
ResponseToEcology.docx(1).pdf
ResponseToEcology.docx(4).pdf
ResponseToEcology.docx.pdf
ResponseToEcology.pdf
schedule_ APMT Stormwater.pdf
Sole Source for Stormwater Treatment.pdf
Sole Source.pdf
Version 2.a.pdf
Water Quality.docx.pdf
December 13, 2017, 5:52pm
Document(s) Released to Requester   Details Public
APMT phone call.pdf
APMT Stored fender piles and other timber.pdf
APMT Stormwater .pdf
APMT Stormwater System.pdf
APMT Stormwater treatment Project Estimate.pdf
APMT Stormwater Treatment.pdf
APMT Stormwater.pdf
B_A or commission.pdf
Conversation with Carolyn.pdf
Engineering Report for Milwaukie Terminal.pdf
FW_ A loss for Tacoma.pdf
FW_ APMT Level 3 Corrective Action ER -- Review....pdf
FW_ APMT Stormwater treatment Project Estimate.pdf
FW_ APMT Stormwater Treatment.a.pdf
FW_ APMT Stormwater Treatment.pdf
FW_ APMT Tacoma _ Gerry _ Question(1).pdf
FW_ APMT Tacoma _ Gerry _ Question.pdf
FW_ PSA v. Ecology & APM, PCHB 16-134..2.pdf
FW_ Shape file for a shoreline permit.pdf
Gerry with APM.pdf
Letter to Ecology re Milwaukee Terminal.pdf
Meeting re NPDES Permit Compliance.pdf
RE_ DISREGARD - _ Meet re_ Marc Street(1).pdf
Re_ PSA v. Ecology & APM, PCHB 16-134.pdf
RE_ ResponseToEcology.docx(3).pdf
RE_ ResponseToEcology.docx(4).pdf
RE_ ResponseToEcology.docx(5).pdf
RE_ ResponseToEcologyFinaldraft.docx.pdf
RE_ SSA West Sitcum Term Sheet Draft 05052017.docx.pdf
ResponseToEcology.docx(2).pdf
ResponseToEcology.docx(3).pdf
West Sitcum Terminal A - WAR305772 - Agreed Order - 10-11-17.pdf
WestSitcumEcology.docx.pdf
November 17, 2017, 4:48pm
Document(s) Released to Requester   Details Public
0307.pdf
2010 Annual Report.pdf
2011 Annual Report.pdf
2012 Annual Report.pdf
2013 Annual Report.pdf
2014 Annual Stormwater Report APMT.pdf
2015 Annual Report.pdf
2016 Annual Report - APMT-Final.pdf
APM Terminals Inspection12-11-13.pdf
APM Terminals WAR00307D-Inspection10-26-16.pdf
APMT MFVIR JAN 2017.pdf
APMTerm-Level3CorrectiveActionEngineeringRpt4-5-17.pdf
APMTerminalsWAR000307_Inspection6-11-15.pdf
APMTerminalsWAR000307_Inspection8-13-15.pdf
APMTerminalsWAR00307D_Inspection2-23-16.pdf
APMTerminals~SO3000307D~3~02-15-07.pdf
APR 2017 MFVIR.pdf
TNT Confirmation.pdf
WAR305772 Permit Cover Letter.pdf
November 6, 2017, 8:37am
Document(s) Released to Requester Public
RE_ Public Records Request #17-71 dated 7_6_2017_AEnglebrecht.pdf
RE_ Public Records Request #17-71 dated 7_6_2017_EDenike.pdf
RE_ Public Records Request #17-71 dated 7_6_2017_GEddy.pdf
November 6, 2017, 8:36am
Document(s) Released to Requester   Details Public
171003. 4B-MEMO-W Sitcum Terminal SSAT.pdf
171016. 3A-MEMO-W Sitcum Stormwater Agreed Order.pdf
171016. 3A-PPT-Agreed Order-Seaman (2).pdf
171017. 4B-PPT-SSAT West Sitcum Lease.pdf
171019. 2C-MEMO-W Sitcum Term-Ecology Agreed Order-Seaman.pdf
October 17, 2017, 7:52pm
Document(s) Released to Requester   Details Public
Agenda Items(1).pdf
Agenda Items.pdf
APM Terminals _ AO _ March Facility Inspection.pdf
APMT Tacoma AO ER Submittal - Final.pdf
FW_ APM Terminals _ AO _ ER Submittal to DOE(1).pdf
FW_ APM Terminals _ AO _ ER Submittal to DOE.pdf
FW_ APMT Tacoma AO ER Submittal - Final(1).pdf
FW_ APMT Tacoma AO ER Submittal - Final.pdf
FW_ RE_ APMT .pdf
Help.pdf
Master Id Request Form_APMT Stormwater Treatmen....pdf
Project Authorization.pdf
RE_ 070374 Port of Tacoma 2016 Water Quality Pr....pdf
RE_ Agenda Items(1).pdf
RE_ Agenda Items.pdf
RE_ APMT (1).pdf
Re_ APMT .1.pdf
Re_ APMT .pdf
RE_ B_A or commission.pdf
RE_ Final Hard Copy of ER.pdf
RE_ Good Morning.pdf
Re_ Project Authorization.pdf
RE_ Version 2.pdf
UP Yard sweeping.pdf
Voice Mail (35 seconds).pdf
October 6, 2017, 5:11pm
Document(s) Released to Requester   Details Public
60 day termination .pdf
Administrative Order.pdf
APM Terminals _ AO _ April Facility Inspection.pdf
APM Terminals _ AO _ May Facility Inspection.pdf
APMT meeting.pdf
APMT Mtg _ Follow Up.pdf
APMT(1).pdf
APMT.pdf
Cost Proposal.pdf
FW_ APMT Level 3 Corrective Action ER -- Review...(1).pdf
FW_ APMT Level 3 Corrective Action ER -- Review...(2).pdf
FW_ Q1 2017 Stormwater Sampling Results _ Two ....pdf
Fw_ Scanned Sheets 7-13.pdf
Fwd_ Q1 2017 Stormwater Sampling Results _ Two....pdf
NWSA Letter to Ecology.pdf
RE_ APM Terminals _ AO _ May Facility Inspection.pdf
RE_ APMT Level 3 Corrective Action ER -- Review...(1).pdf
RE_ APMT Level 3 Corrective Action ER -- Review...(2).pdf
RE_ APMT Level 3 Corrective Action ER -- Review....pdf
RE_ APMT Mtg _ Follow Up(1).pdf
RE_ APMT Mtg _ Follow Up.pdf
RE_ APMT stormwater.pdf
Re_ APMT.pdf
RE_ Cost Proposal(2).pdf
RE_ Rich Doenges.pdf
RE_ Sitcum West Terminal(1).pdf
RE_ Sitcum West Terminal(2).pdf
RE_ Sitcum West Terminal(3).pdf
RE_ Sitcum West Terminal.2.pdf
RE_ Sitcum West Terminal.pdf
RE_ Update_.pdf
Scanned from a Xerox Multifunction Printer.pdf
Sitcum West Terminal.pdf
Update_3.pdf
September 15, 2017, 6:39pm
Request Opened Public
Request received via web
July 6, 2017, 8:46am
Show All History Items